The Pieces of Blueprints, Drawing Installation, 2020
The Pieces of Blueprints, Drawing Installation, 2020
The Pieces of Blueprints, Drawing Installation, 2020
The Pieces of Blueprints, Drawing Installation, 2020
The Pieces of Blueprints, Drawing Installation, 2020
The Pieces of Blueprints, Drawing Installation, 2020
The Pieces of Blueprints, Drawing Installation, 2020
The Pieces of Blueprints, Drawing Installation, 2020
The Pieces of Blueprints, Drawing Installation, 2020
11 / 2025
mon
tue
wed
thu
fri
sat
sun
2016 Tour Dates | Tickets | |||||
|---|---|---|---|---|---|---|
1
19-22h
2
12-15h
19-22h
3
12-15h
19-22h
4
12-15h
5
19-22h
6
12-15h
19-22h
9
12-15h
19-22h
7
8
10
12-15h
19-22h
11
12
13
14
15
12-15h
19-22h
16
17
12-15h
19-22h
18
12-15h
19
12-15h
19-22h
20
21
12-15h
19-22h
29
12-15h
19-22h
30
12-15h
19-22h
22
23
24
25
26
27
28
.png)
Brunnen
A circulating water system is built into the window recess of GNMR – Neue Musik Zentrale.
Brunnen is the third version of my ongoing series that brings field recordings from various water facilities into each exhibition site and reconfigures them in relation to each site’s spatiality.
In Brunnen, one can especially hear from the street the field recordings from a water treatment facility, where the city’s wastewater is pumped up from underground sewers by inlet pumps, with its carried debris being dispersed and purified before the lightened water is released back into the river. These recordings intertwine with the mechanical hum of the Brunnen installation’s pump motor on the window sill.
The visual hints of the display window, operated by the submersible pump, merge with the sounds of a lift station with screw-pump lift, a grit removal and grease separation stage, and a biological treatment tank.
Brunnen will run actively throughout November as part of Vindu at the Neue Musik Zentrale, with intermittent breaks in the pump operation.
Technique
Katrina Kizenbaha
Field Recording Support (Location)
Kläranlage Paderborn
Special Thanks
Soojin Ok
Valia Fetisov
